Decoration Process Quality Assurance Supporting Service

One consultation

 

1. The customer calls or visits the company to consult the company overview.

 

2. Professionals (or designers) receive customer visits, answer the owners’ questions in detail, understand the owners’ investment and requirements for the home, (including The whole part of the area, part of the living room, dining room, kitchen, study, master bedroom, children's room, bathroom, balcony room)

 

Two designer on-site measurement

 

1. According to the agreed time, the designer will come to the site to actually measure the area and other data of the place to be decorated.

 

2. The designer has a detailed understanding of the owner’s specific requirements and ideas for decoration.

 

3. According to the requirements of the owner, inspect the structure of the house, the designer proposes a preliminary design concept, and the two parties communicate the design plan.

 

3 Discuss the design plan

 

1. The owner goes to the company to see the preliminary design plan, and the designer introduces the design intention in detail.

 

2. According to the floor plan, effect drawing and specific introduction of the designer provided by the designer, the owner puts forward opinions and revises (or approves) the design plan.

2. Pass)

 

Four determine the decoration plan

 

1. The owner will finally confirm the construction drawings, and the quotation engineer will make a budget for the price of the main materials and the brand of the engineering labor.

 

2. The designer cooperates with the owner to carefully understand the decoration project budget, implement the construction project, and check and verify the unit price and quantity in the budget.

 

Five Sign the formal contract (in duplicate)

 

1. Determine the construction period and start date of the project, understand the construction organization, plan and personnel arrangement.

 

2. Formally confirm and sign the decoration contract (including the decoration contract text, contract attachments, drawings, budget)

 

3. Pay the first phase of the project payment

 

Pre-construction stage

 

One property management aspect

 

1 Apply for the construction permit before entering the site, the construction personnel must have complete certificates, (ID card, post permit, access permit)

 

2Understand the relevant regulations of the property, such as allowable construction time, construction requirements, etc.

 

2 Design site presentation and inspection

 

1 On the day of construction, the designer summons the owner, the project supervisor and each group leader to make an on-site briefing to finalize and implement the construction plan.

 

2Check work

 

(1) Whether there are defects in the original building: beams, columns, floors, walls and other structures, such as: whether the floor is leaking or empty Drum, delamination, shelling, cracks. Whether the external wall seeps into the interior, whether the wall is vertical, whether there are cracks, delamination, whether the beams and columns are straight, whether the door and window glass is damaged.

 

(2) Check whether the floor drain and sewer are unblocked, and protect it in time

 

(3) Check the home power cord (television, computer, telephone, etc.) if the home cord is not suitable, notify the owner in time.

 

3 feeding and acceptance

 

(1) The project supervisor informs the company's material distribution center to uniformly distribute decoration materials.

 

(2) The owner shall refer to the budget sheet, material quality and brand for acceptance, and fill in the <decoration material acceptance form>. Acceptance is qualified, Construction personnel can start construction.

 

(3) The decoration materials provided by the owner should go out and buy according to the time in the <Construction Schedule> In this case, Party B (decoration company) can send someone to cooperate with the purchase, and Party A can also entrust Party B to purchase on its behalf, and must sign the <main material purchasing power of attorney>.

 

Mid-stage construction

 

1. For areas with waterproof requirements (such as toilets) after the sinking bucket is waterproofed, do a 24-hour closed-water experiment to check whether the waterproofing Do it a bit.

 

2. During construction, the person in charge of the construction (supervisor) organizes and manages various types of work, and supervises and inspects the quality of the project. If any problems are found, they will promptly notify the owner and The designer carries out project rectification.

 

3. The company’s quality inspectors inspect the organization, management, specification and construction quality of the construction site from time to time, and leave inspection records on the construction site for the owner Supervision.

 

4. The owner and the project supervisor shall discuss and determine all the changed construction projects, and fill in the <project change form>.

 

Fifth, after the completion of the water and electricity renovation project, the supervisor shall carry out the inspection and acceptance of the concealed project and make a record of the project.

 

Six. The company’s management personnel contact the owners regularly to listen to the owners’ real thoughts and valuable opinions.

 

Later stage of construction

 

1. When the project is basically completed, the project supervisor will conduct a comprehensive and detailed self-inspection work. After the inspection is completed, the owner will be notified if there is no quality problem, and the engineering department will proceed. Finish the whole experience and receive it.

 

2. If problems are found during acceptance, discuss rectification: If the acceptance is qualified, fill in the <Project Acceptance Form> and affix the warranty seal, The project was officially delivered to the owner for use.

 

After completion

 

I. Hydropower is guaranteed for five years, and the other two years are guaranteed. During the warranty period, if the project has quality problems (non-human), the company is responsible for free Home maintenance.

 

Second, life-long maintenance system, after the warranty period, if there is a quality problem in the project, the company will also be responsible for the maintenance, and the cost will be charged according to the actual situation.

 

Three, regular return visit system, after the completion of the project, the company's customer service staff will regularly return to the owner to understand the quality and use of the project, and to remind the owner in time Precautions.