Decoration Process Quality Assurance Supporting Service

Basic introduction:

 

Management strength: Each department has a reasonable division of labor, clear responsibilities, and a sound system, and introduces a performance appraisal system to improve and Strengthen management.

 

Design power: Designers from regular colleges and universities, years of experience in case design, humane and personalized The design takes all details into consideration, and tailor-made fashion design schemes for customers.

 

Contract signing: Adopt the official national contract text and resolutely resist the overlord clause. All aspects of the later period are fully and meticulously included in the contract clauses and clauses, and "construction technology", "material standards" and so on.

 

Project budget: All construction projects are complete, and the number fluctuates by 5%, never lose items, and put an end to the first The trap of making up for the missing piece.

 

Decoration materials: All materials are distributed by the company to reduce costs and prevent counterfeiting. We solemnly promise to punish fake materials. 10. Mark the price clearly and indicate the brand, specification and grade of the material.

 

Construction power: All construction workers have more than ten years of construction experience in Chaoshan, skilled in skills, and various types of work are managed by the company Classified professional training, all work with a certificate.

 

Supervision and management: The construction site is directly managed by the supervision engineering team leader, and the engineering department manager is fully responsible, checks and responsibilities at all levels clear.

 

After-sales service: After the completion of the project, the water and electricity warranty is five years, and the other two years are guaranteed. Emergency repairs are in place within 24 hours, and repairs are in place within 48 hours, and visit customers regularly to remind them and understand the situation

 

Environmental protection plan:

 

1, environmental protection design

 

When designing the space, the designer follows the principle of “simple and practical”, strengthens the combination of materials, and minimizes paint and coatings according to local conditions , The use of highly polluting materials such as synthetic boards.

 

Accurate budget, minimize garbage pollution caused by material waste, make full use of natural light sources and ventilation, and at the same time, beautify the interior through the reasonable arrangement of green plants Environment, improve air quality.

 

2, environmentally friendly materials

 

The company purchases and feeds materials uniformly, strictly controls materials, and never allows fake and shoddy materials to flow into the project.

 

Strictly implement national environmental protection standards, select environmentally-friendly and safe materials that meet national regulations, collect market information in time, and select low-toxic, non-toxic green health product.

 

3. Environmental protection technology

 

(1) Irregular construction technology is the third key factor causing indoor pollution. The company refers to international and domestic advanced construction standards and experience, Continuously improve the construction process and reduce the source of process pollution in an all-round way.

 

(2) Use pollution-free and less-polluting crafts and practices, especially for paint, glue, putty, etc. to strictly control the interval time, Ventilate in time to eliminate peculiar smell. Strengthen site management, clean up engineering waste in time, improve site hygiene, put some useful green plants, and meet civilized construction standards.

 

(3) After finding that the indoor air of a family is polluted, firstly open more doors and windows to maintain indoor ventilation (especially for newly decorated houses); Raise some flowers and plants that can absorb harmful substances to reduce the amount of indoor harmful substances. When the pollution reaches a certain level, some physical and chemical methods must be used for on-site and continuous treatment. The specific methods are as follows:

 

Plant absorption method:

 

a Plants that can absorb methanol, such as spider plant, aloe vera, agave, tiger tail orchid, etc.

 

b Plants that absorb benzene, such as ivy, iron tree, etc.;

 

c Plants that can absorb trichloroethylene, such as Evergreen, daisy, agave, etc.;

 

d Plants that can absorb sulfur dioxide, such as roses, roses, etc.;

 

e Plants with dust-absorbing effect, such as sweet-scented osmanthus;

 

f plants with bactericidal effect, such as mint.

 

Instrument sub-equipment absorption decomposition method:

 

a The aggressive and predatory nature of ozone can break the molecular formula of methanol, turn it into carbon dioxide and water, and achieve the purpose of decomposing methanol, such as some air Deal with the ozone machine.

 

b Using electrons, ions and nanotechnology to eliminate indoor methanol, benzene, TVOC and other harmful substances, such as air purifiers.

 

c Adopt nano-photocatalyst technology to decompose and oxidize benzene, methanol, ammonia and other harmful gases, turning them into non-toxic and harmless gases. Water vapor can eliminate all kinds of peculiar smells, such as “clear air” and so on.

 

Process upgrade

 

Mason construction requirements:

 

1 Accurate line laying, wall and line hanging, three lines, one hoist, five lines, one lean

 

2 Horizontal and vertical, full mortar, uniform thickness, staggered joints

 

3 tie-in steel bars in accordance with the standard door lintel structure is firm

 

4 Plastering cramps, smooth walls, smooth corners of yin and yang, no cracks

 

5 Waterproof in place, level of paving, flat and flat, in line with regulations

 

6 SMD touch angle 45 degrees, wall and column angle 90 degrees, suitable for storage, suitable size

 

7 The interface is tight, neither dislocation nor lacking, smooth arc wall

 

8 Beautiful appearance, clean surface, safe and reliable, even gaps

 

Woodworking requirements:

 

1 Familiar with drawings, adapt to local conditions, arrange reasonable and just right

 

2 Appropriate arrangement, construction in place, suitable size, tight moisture-proof

 

3 Application according to materials, fine selection of materials, rational use of materials, economical materials

 

4 The frame is firm, the structure is reasonable, horizontal and vertical, the interval is appropriate

 

5 Smooth finish, uniform glue application, fine nail holes, contrast in tone

 

6 The lines are straight and the wood grain is the same, the seams are even, the color is distinct

 

7 Tight closing, smooth and flat, reasonable covering, smooth curvature

 

8 Beautiful appearance, flexible and safe, no bumps or lack of shock

 

Paint construction requirements:

 

Clear the surface, uniform oil layer, no sand particles, no dew drops, smooth hand feel

 

Inciting dust construction requirements:

 

Clear the bottom layer, the bonding is firm, the positive angle is square, the coating is even, flat and smooth

 

Hydropower construction requirements:

 

1 Electrician enters the site, checks the incoming line, construction safety of electrical installations

 

2 Accurate positioning, reasonable arrangement, proper arrangement How to use

 

3 The cut groove is straight, the depth is appropriate, the bottom box is flat, and the burying is stable

 

4 The load-bearing structure shall not be moved, the beam shall not be punched, the column shall not be perforated

 

5 Wiring, neatly arranged, branched tee, straight pipe straight through

 

6 Wires through pipes of moderate size, fixed wire codes, uniform wire pipes

 

7 Wiring color separation, the live wire is red, the neutral wire is blue, and the ground wire is two-color

 

8 line protection box with lock, beam-wound wax tube, ceiling hose

 

9 It is strictly forbidden to stop the loop borrowing line midway wiring borrowing the old line

 

10 Use air conditioning, install hot water pipes, install microwave ovens, and set up a dedicated line

 

11Electrical circuit spacing distance leave room for proper spacing

 

12 mortar to seal the groove with water moisten both sides with hair on both sides without exposing the tube

 

13Install the pendant lamp Ceiling fixing Expansion bolts firm and reliable

 

14 socket switch, horizontal and vertical, beautiful appearance, sensitive when energized

 

15 total distribution point box leakage switch air switch to protect safety

 

16 Lighting installation is reasonable and appropriate to beautify the environment and the indoor is bright

 

Seasonal decoration:

 

The decoration is generally adopted from April to December, but there is no need to be afraid of decoration in the rainy season

 

1, the rainy season decoration must take corresponding measures to prevent moisture, moisture, and eliminate its various adverse effects. This requires you to first increase the intermittent time between technical processes and extend the construction period appropriately.

 

2. After the furniture is painted, it is not easy to dry because the air is humid, so after the first coat of paint, you must wait for it to dry before painting. Twice.

 

3. Do not paint on rainy days, because on rainy days, a layer of water vapor will condense on the surface of the furniture. In the paint film, the surface of the furniture is dirty and unclear.

 

4. When buying wood materials on rainy days, consider their moisture content. Buy wood that is usually dry and leave it unoccupied for a period of time on the construction site to adapt to the surrounding humidity to avoid deformation. Again, we must pay attention to ventilation, ventilation and drying, this is the necessary way to solve the dampness.

 

5. When painting, wipe off moisture with a dry cloth, open doors and windows for ventilation, and dry the furniture after painting.

 

6. During construction, prevent wooden furniture, doors and windows from deforming due to moisture, and use heavy equipment before they are painted. The object is flattened for a period of time; after the floor tiles are laid, they cannot be stepped on immediately, and a pad must be installed before walking. </